top of page

125 Metcalfe Road
Subdivision Driveway
This project involved the design and installation of an effective retaining wall system to support and enhance the infrastructure of a 74-lot townhouse subdivision. This was achieved through a series of timber retaining walls with planting in behind them to break up the monotone fence panels above the wall. The walls were positioned to facilitate the optimal use of space for the construction of townhouse units.
Project Gallery












bottom of page